Elwood Blues
Registered
So...
I am a 3d modeler at an architectural visualisation company.
my boss has recently given me a task to evaluate creating a full 3D track for a sim game.
So I went into research mode and (3,5 days later...) managed to get a working road model in Rfactor 2 Dev Mode.
However, judging by that, creating a full track would probably cost me many months of work, as the learning curve is quite steep (plugins, tutorials, scripts, game engine etc.).
So my question is - how long would it take for an experienced modder to create a ~5 km track on uneven terrain, with all the surrounding infrastructure, several buildings and greenery?
This may be a strange question, but I feel that I should spend another 2-3 weeks modelling the track to really answer that question, and that is not an option in my workplace. I do not need a very precise answer, I'd like to know if it's more like 4 weeks or rather 4 months.
Regards!
I am a 3d modeler at an architectural visualisation company.
my boss has recently given me a task to evaluate creating a full 3D track for a sim game.
So I went into research mode and (3,5 days later...) managed to get a working road model in Rfactor 2 Dev Mode.
However, judging by that, creating a full track would probably cost me many months of work, as the learning curve is quite steep (plugins, tutorials, scripts, game engine etc.).
So my question is - how long would it take for an experienced modder to create a ~5 km track on uneven terrain, with all the surrounding infrastructure, several buildings and greenery?
This may be a strange question, but I feel that I should spend another 2-3 weeks modelling the track to really answer that question, and that is not an option in my workplace. I do not need a very precise answer, I'd like to know if it's more like 4 weeks or rather 4 months.
Regards!